Drying Logs

About drying logs

Wave builds a drying log from your estimate and local weather, with chambers, equipment and daily targets in place before you record readings.

Last updated

Wave builds your drying log from the job's estimate and local weather, so you start day one with chambers, equipment and daily targets already in place. Your team records the real readings, and the log becomes a clear daily record for everyone on the claim.

The Drying tab: AI-generated drying plan with the air moisture chart

A drying log is the daily record of how a water loss dried: the conditions, the equipment that ran, and how the materials came down day by day.

Wave generates sample dry logs based on what real drying science would be, to help anyone on your team who is new to drying understand the drying goals for the job. When a job includes drying, Wave builds a plan from the estimate (the affected rooms, the water category and the drying equipment billed on it) plus local weather, and applies the drying science for you. On Basic and above, and on the free trial, Wave creates the log for you. On Starter, you start it with one of your free drying logs.

Already have a drying log? Attach it in a chat from Home or in the job's chat. Wave reads it, answers questions about it and records any readings you tell it. You can upload photos or PDFs of an existing drying log.

Spot-check readings on site, and enter what your meters say.

One log per job

Each job has one drying log, and all estimates on the job share it. It lives on the job: open Jobs, pick the job, and select Drying. On a phone, pick Drying from the job's view menu.

Wave creates the log automatically the first time the job qualifies, and a later estimate adds to the same log. On Starter, a log starts when someone on your team confirms it. A job that already carries more than one log from earlier work shows the main log, with links to the others.

A drying log starts at 3 drying days. A job scoped for 1 or 2 days is stabilization, so the tab invites you to add drying days in chat if you need a log. A job with nothing to dry shows "No drying on this job."

Targets give you a starting point

The plan lays out daily targets for temperature, relative humidity and material moisture.

  • Your readings are the record. Enter what your meters say in the field. Wave's plan stays alongside them as the target.
  • Your readings stay as you entered them. When the plan is adjusted or regenerated, only future targets change. Your readings, notes and past days stay as they are.
  • Your judgment leads. If the structure dries differently than the plan expected, trust your meters, record what you see and adjust the plan.

What you get

  • A grid for each chamber. Each chamber is its own block, headed with its water class, square footage and drying days. Rows are temperature, RH, GPP and material moisture, and days run across as columns. GPP is calculated for you from temperature and RH.
  • Each room's own days. A room can keep drying after the rest of the job is done. Its block shows how many days it dries and the day its drying ends, and the job's drying days match the longest room's. See Per-room drying days.
  • Color that shows who measured what. Blue values are readings a person measured. Wave's plan values, and anything Wave filled in, are plain ink.
  • A chart per chamber showing the GPP line, blue where measured and dotted where projected, with a Conditions table for outside and unaffected reference readings.
  • Notes and a closing note that print on the drying log PDF.
  • A drying log PDF you can export on its own or combined with the estimate.

What you change on the tab, and what you ask Wave

On the Drying tab you can edit readings, the start date, the job's drying days, each room's drying days, a day's date, the pull reading, days that were not monitored, notes and the closing note. Day changes on the tab update the log, and the estimate keeps its billed days.

Equipment counts, dehumidifier type, heated or unheated, merging chambers and moving equipment between rooms change through Wave in the job's chat. When the estimate and the log differ, a card on the tab shows each room's difference, day by day, and asks whether to update the drying log or keep it as it is.

Wave's chat is also where you get advice. Ask Wave "are we on track?" and it answers from your measured readings.

Drying logs on Starter

On Starter, water jobs have a Drying tab, and your company gets 5 free drying logs. They don't expire and don't use estimate credits. For the steps to start one, see Find and start your drying log.

  • You choose when to use one. A log starts when someone confirms Start drying log. Anyone on your team who can edit the job's estimate can start one.
  • The tab shows what's left, for example "3 of 5 free drying logs left."
  • Everyone gets a heads-up. After signing in, each person in a Starter company sees a "5 free drying logs, on us" message until they close it. To see it again, open Inbox in the account menu. It clears after about a week, or once your free logs are used.
  • Logs you start keep working. Readings, edits, regenerating and the PDF keep working on those logs, even after your 5 are used.
  • After 5, new logs come with Basic. On a job without a log, the tab says "You have used your 5 free drying logs. Drying logs come with Basic." Admins see a See plans link. Other teammates are prompted to ask an Admin to upgrade.

If your plan doesn't include drying logs, a saved link to a drying log shows a one-line note that drying is not on this plan. See Plans and limits.