Per-room drying days
Each room can keep drying on its own schedule, and the estimate, drying log and PDF show that room's days.
Bill exactly what ran, and show adjusters a log that matches the job room by room. Jobs dry unevenly: you pull equipment from the rooms that reached goal and leave a fan or a dehumidifier in the one that's still wet. Wave follows that. Each room can run its own number of drying days, the estimate bills what actually ran, and the drying log shows each room drying to its own last day.
Spot-check readings on site in each room that is still drying. Per-room days work on water estimates on all plans. The Drying tab and PDF use a drying log, which comes with Basic and above, the free trial, or one of Starter's 5 free drying logs.
Each room can dry on its own schedule
- Each room starts on the job's drying days. Give one room more days and only that room changes.
- The job's drying days match the longest room's.
- Each room has at least 3 drying days, the same minimum as the job.
The estimate follows each room too, so what you bill matches what ran.
Give one room more days
- Open the job's chat. On desktop it sits beside each tab. On a phone, pick Chat from the job's view menu.
- Tell Wave what's happening on site, for example "the hallway needs one more day with the dehumidifier."
- Answer Wave if it checks with you.
Only the equipment you name runs longer. The room's other lines keep their original last day. If you don't name a piece and the room has several, Wave asks which one.
When your request is clear, Wave makes the change and then tells you the estimate total before and after. When it isn't clear whether you mean that room, the whole job or no change at all, Wave asks first and shows the estimate total each choice would leave.
If you already logged a final (pull) reading for that room, it becomes an ordinary reading for that day and the room keeps drying.
Change the whole job's days
Ask Wave to change the drying days for the whole job.
- Longer: rooms with equipment still running on the old last day continue, and only that equipment. Rooms that ended early keep their own last day.
- Shorter: each room is cut to the new last day.
Moving equipment between rooms
Tell Wave what you moved and when: "moved one air mover from the kitchen to the hallway on day 4." It's still one unit. It bills for the days it ran, split between the two rooms.
The line's note spells out the schedule, for example "2 air movers days 1 to 3, 1 air mover day 4". When the count per day isn't known, the note says "units per day not stated". If the room you moved from didn't have that many units on those days, Wave asks before it changes anything. If you mention the same move again, Wave asks whether it's the same unit or another one, so each move is recorded once.
What the Drying tab shows
- Each room's days. A line above each room's table shows how many days that room dries and the day that room's drying ends, with its date when the log has a start date.
- Equipment by day. A room whose equipment changes from day to day, like a fan moved in on day 4, gets Air movers and Dehumidifiers rows under its readings.
- The job's days. The drying days in the header are the job's, which match the longest room's.
If you can edit the log, the room line is a Dries select: Follow the job, or a number of days. It updates the drying log, and the estimate keeps its billed days. If you shorten the job's days in the header, a room with its own longer days keeps them, and the job runs to that room. A short notice after each change says how long the room dries and how long the job runs, and undo on the tab walks it back.
To keep the estimate and the log in step, make day changes by asking Wave. When the two differ, the Drying tab shows each room's difference day by day and offers to update the drying log. Keep it as it is leaves the log alone and remembers the days as well as the counts.
Blue values are readings a person measured. Plain ink values are Wave's plan.
On the estimate
A room whose days differ from the job's shows a Dries N days tag on its room header. The room's daily equipment bills for the days each unit ran in that room.
On the drying log PDF
When rooms end on different days, or equipment changes from day to day, each room prints its own table with its equipment beside its readings and the day its drying ends. The drying window runs to the longest room. The combined packet prints the log the same way. See Export a drying log.
In the estimate history
A change to one room's days gets its own entry, for example "Hallway now dries 4 days, was 3" or "Hallway follows the job again, was 4 days", with the money before and after like any other change. Moved equipment gets its own entry too.
Undo walks it back like any other estimate change, and restores the room's days along with its lines. If the undo changes one room's days, Wave asks under the arrows whether to bring the drying log along. See Undo and redo.
Related
- Drying equipment and drying days: how drying equipment bills on the estimate and in the log
- Adjust a drying plan: change dates, days, equipment or chambers
- Estimate history: who changed what, with money before and after