Drying Logs (Beta)
Adjust a drying plan
Jobs change. Update chambers or equipment and let Wave refresh the remaining days without touching your recorded readings.
Last updated
Beta: Drying logs are in beta and available on select plans. Details may change as we improve the feature.
Real jobs rarely follow the day-one plan. A dehumidifier fails, you add air movers, or a chamber needs to be split. When the setup changes, update the plan so the rest of the log reflects reality.
Update the setup
- Open the Drying tab and open the plan settings.
- Change what changed on site: equipment counts, dehumidifier type, or chamber setup.
- Save. Wave refreshes the suggested targets for the remaining days.
You can also tell Wave in chat: "the LGR in the kitchen died, we swapped in two air movers." Wave updates the plan for you.
What regenerating does and does not change
- Updates: suggested targets for days still ahead of you.
- Never changes: readings you recorded, or targets for days already logged. Past days stay as they were, so your log remains an honest history of the job.
When to adjust
- Equipment added, removed, or swapped
- A chamber opened up, combined, or split
- The drying window is extended
If your readings show the structure drying faster or slower than expected, that is your call to make. Adjust the plan to match the job, and let your recorded readings tell the story.