Drying Logs
Adjust a drying plan
Change dates, days, equipment or chambers, and Wave re-plans the days ahead while recorded readings stay as you entered them.
Keep the drying log in step with the job. Change dates, days, equipment or chambers, and Wave re-plans the days ahead while the readings you've recorded stay as you entered them.
Real jobs shift: a dehumidifier is replaced, you add air movers, or a chamber is split. Update the plan and the rest of the log reflects the job as it's running. Adjusting a log comes with Basic and above and the free trial. A log started with one of Starter's 5 free drying logs can be adjusted the same way.
Change the start date or drying days
The top of the Drying tab shows when drying started and the job's drying days, which match the longest room's. Both can be edited there.
- Open the job and select the Drying tab.
- Click the start date (it reads Started followed by the date) or N drying days.
- Pick the new date or type the new number of days, then press Enter.
Wave re-plans the targets for the days ahead. If the log already has recorded readings, moving the start date first asks you to confirm with Move the drying schedule?. Each existing reading keeps the calendar date it was recorded on.
Three things to know about changing drying days here:
- The log updates, and the estimate keeps its billed days. To change both, ask Wave instead (see below).
- Billed days come first. If a line on the estimate is billed for a specific number of days, the log keeps those days until that line changes. The message names the line so you can update it on the estimate first.
- Rooms with their own days keep them. If you shorten the job below a room that has its own longer days, that room keeps them and the job runs to that room. A short notice says how long the job now runs.
Change one room's days on the tab
Each room's table has a Dries line above it. If you can edit the log, pick Follow the job or a number of days. This updates the drying log, and a short notice says how long the room and the job now dry. Undo on the tab walks the change back.
To change what the estimate bills for that room too, ask Wave instead. See Per-room drying days.
To edit these fields on a locked estimate, unlock the estimate first.
Change equipment, dehumidifiers or chambers by telling Wave
Equipment counts, dehumidifier type, whether a chamber is heated, and merging or splitting chambers all change through Wave in the job's chat. Just tell Wave.
Tell Wave what happened the way you'd tell a coworker: "the LGR in the kitchen died, we swapped in two air movers." Wave updates the plan for you.
When it isn't clear what you mean, Wave asks a focused question before it changes anything. For example, if you ask to extend drying without saying where, Wave asks whether the change is for one room or the whole job. Afterward, Wave offers to update the estimate to match, and it touches the estimate only if you say yes. See Per-room drying days for how room changes and totals work.
When the estimate changes, the Drying tab asks
If the estimate's drying equipment, a room's drying days or room sizes change after the log was made, the Drying tab shows a card that lists the rooms that differ.
- For equipment and days, the card compares each room day by day, for example "Hallway: the drying log plans 3 days. Updating it would plan 4 days." Choose Update the drying log or Keep it as it is. Keeping it remembers the days as well as the counts.
- For room sizes, the card says the room has changed size since the drying plan was made. Choose Regenerate plan or Keep as is.
You choose, and logged readings are kept either way. The same question appears if you undo or redo an estimate change that alters drying equipment, a room's drying days or room sizes.
If an update would change what a room's recorded readings are measured against, the card explains why and offers to keep the log as it is.
When Wave needs a detail on a quantity
If Wave can't tell how many units ran each day, it asks before it builds or regenerates the log. The Drying tab asks under the message whether the number is units a day or unit-days in total, and your answer updates the line on the estimate. See Drying equipment and drying days.
What regenerating changes
- Updates: targets for days still ahead of you.
- Stays as you recorded it: your readings, your notes and days already in the past, so your log stays an accurate history of the job.
When to adjust
- Equipment added, removed, or swapped
- A chamber opened up, combined, or split
- Equipment moved from one room to another
- The drying window extended or shortened, for the whole job or one room
If your readings show the structure drying faster or slower than expected, you decide what the plan should look like. Adjust it to match the job; your recorded readings stay as they are. Spot-check readings on site as you go.
Related
- Drying equipment and drying days: how drying days and equipment bill on the estimate and in the log
- Record drying readings: log what your meters say
- Per-room drying days: let one room dry longer than the rest