Rooms & Line Items
Undo and redo
Edit with confidence. Changes to an estimate, yours or Wave's, can be undone with ⌘Z and redone with ⇧⌘Z.
Edit freely. Changes to an estimate, yours or Wave's, can be undone with ⌘Z and redone with ⇧⌘Z, so you can try an edit and step back if it isn't right.
Undo and redo work on the job's Estimates tab, whether you made a change by hand or asked Wave to make it. The Drying tab keeps its own history.
How to undo and redo
- ⌘Z (Ctrl+Z) undoes the latest change.
- ⇧⌘Z (Ctrl+Shift+Z) redoes it.
- On a computer, the Undo and Redo arrows in the job's top bar do the same thing.
On a phone, use ⌘Z or Ctrl+Z with a connected keyboard. The arrows appear on desktop.
If you're typing in a cell, ⌘Z undoes your typing in that cell first, like any text field. Click out of the cell to undo changes to the estimate.
What undo covers
One history holds the changes you make and the changes Wave makes:
- Adding and deleting line items and rooms
- Editing descriptions, quantities, units and prices
- Reordering items and rooms
- Applying and removing modifiers
- Moving or copying items between rooms
- A room's drying days and drying equipment moved between rooms, on water estimates
- Changes Wave made to the estimate when you asked in chat
Undo reverses estimate changes and leaves the conversation as is, so Wave's reply stays in the chat after you undo what it did.
Each undo and redo also shows up in Estimate history, so your team can see what changed.
When undo and redo pause
Undo and redo pause:
- While Wave is working. They come back when Wave finishes.
- While the estimate is locked. See Lock and unlock an estimate.
- When your account is read-only.
- When the change affects a room that the drying log uses or that photos are filed under.
If an arrow is dimmed, click it or press ⌘Z and Wave explains why next to the arrows.
When an undo touches the drying log
If an undo or redo changes the drying equipment, a room's drying days or room sizes the drying log was built from, Wave asks under the arrows whether to bring the log along. Choose Update the drying log or Keep it as it is.
The Drying tab has its own undo
The Drying tab keeps its own undo history for your reading edits and room drying-day changes during the current session. Press ⌘Z there, or use the top-bar arrows while you're on that tab, to reverse your last change on the tab. Estimate undo leaves your recorded readings as they are. See Record drying readings.
Related
- Edit a line item manually: hand edits you can undo
- Edit a line item via chat: Wave's edits land in the same history
- Estimate history: a dated record of changes
- Keyboard shortcuts: the full list of shortcuts
