Find and start your drying log

Wave builds the job's drying log once the job includes drying, with chambers, equipment and daily targets ready before day one.

Last updated

On Basic and above, and on the free trial, Wave builds your drying log as soon as a job includes drying: chambers, equipment and daily targets are ready before day one. Wave generates sample dry logs based on what real drying science would be, to help anyone on your team who is new to drying understand the drying goals for the job. On Starter, you start each log yourself with one of your free drying logs. Already have a drying log? Attach it in a chat from Home or in the job's chat. Wave reads it, answers questions about it and records any readings you tell it. You can upload photos or PDFs of an existing drying log.

The Drying tab: AI-generated drying plan with the air moisture chart

Find the log

  1. Open Jobs and pick the job.
  2. Select Drying. On a phone, pick Drying from the job's view menu.

Each job has one drying log, and all estimates on the job share it.

If the log hasn't started yet

The Drying tab tells you what's needed:

  • "No drying on this job." Tell Wave about the water loss in the job's chat so the estimate includes drying.
  • Fewer than 3 drying days. A drying log starts at 3 drying days, and a 1 or 2 day window is stabilization. If the job needs a log, ask Wave in chat to add drying days.
  • "No drying plan yet." The job qualifies and the plan is ready to build. Ask Wave in chat, "generate the drying plan," or select Generate now. On Starter, see below.

Start a log on Starter

On Starter, water jobs have a Drying tab and your company gets 5 free drying logs. They don't expire and don't use estimate credits. Opening a job, viewing the Drying tab or completing a job doesn't use one. You decide when to start a log.

  1. Open the water job and select Drying. The tab shows how many you have left, for example "3 of 5 free drying logs left."
  2. Ask Wave for a drying log in the job's chat, or select Generate now. The link says it uses one of your free drying logs.
  3. A box asks Start a drying log? Choose Start drying log to use one. Not now uses nothing, and neither does closing the box.

Wave checks the job first, so it only offers a free log when it can build one. If the estimate has nothing to dry, Wave tells you and no free log is used.

Once your 5 are used, new drying logs come with Basic. The tab says "You have used your 5 free drying logs. Drying logs come with Basic." Admins see a See plans link, and other teammates are prompted to ask an Admin to upgrade. Logs you already started keep working: readings, edits, regenerating and the PDF.

What the plan starts with

  • Chambers. Drying zones tied to the rooms on the estimate.
  • Daily targets. Temperature, relative humidity and material moisture for each chamber, for each day of the drying window.
  • Equipment. The drying equipment billed on the estimate. The log follows the equipment counts on the estimate.

The header shows the start date, the number of drying days, and where the weather came from (a place name, or "Weather: estimated" when local weather wasn't available). In the grid, Wave's plan values are plain ink. Readings your team measures show in blue, so the two are easy to tell apart.

Check before the first monitoring visit

Before day one, check that:

  • Chambers match your containment. If two rooms share one setup, ask Wave to merge them.
  • Equipment matches what you placed. If the counts differ, tell Wave what is on site. When the estimate and the log differ, a card on the tab asks whether to Update the drying log or Keep it as it is. Your readings are kept either way.
  • The start date and drying days are right. Click either one in the header to change it. Wave re-plans the future days to match.
  • Each room's schedule fits the job. If one room needs longer, ask Wave, for example "keep the dehumidifier in the hallway 2 more days." Only the equipment you name runs longer, and the estimate bills that room for the days it ran. See Per-room drying days.

Then start recording readings on your first monitoring visit, and spot-check them on site.

If Wave needs a detail to build the log

If an equipment line on the estimate needs a detail before Wave can build or update the log, the message names the line and says what to fix. When Wave can't tell whether a quantity means units a day or unit-days in total, the tab asks you, and your answer updates the line. Correct the line on the estimate if needed, then try again. See Drying equipment and drying days.

If the estimate is locked, the log is read-only until you unlock it.